Temporary drainage structures
# | Preview | Title & Description | Spec | File |
---|---|---|---|---|
1 |
Diversion channel
7 pages Diversion Channels: Design guidelines for temporary diversion channels. Includes discussion on design standards, a stepped design procedure, and a worked example. Advantages, limitations, common problems, special requirements, site inspection, installation and maintenance. Fig=2; photos=2; tables=2 |
3.31 KB |
273.88 KB |
|
2 |
Drainage control - General
2 pages Drainage Control – General: Document outlines the principles of temporary construction site drainage control. Fig=0; photos=0; tables=1 |
N/A |
37.19 KB |
|
3 |
Energy dissipaters
8 pages Energy Dissipaters: An overview of the different types of energy dissipaters. Includes design procedures for concrete and rock-lined hydraulic jump dissipaters. Fig=2; photos=14; tables=5 |
N/A |
346.28 KB |
|
4 |
Flow control berms
3 pages Flow Control Berms: Discussion on the design parameters for use of different types, advantages, disadvantages of technique, installation, removal and common problems. Fig=0; photos=2; tables=1 |
1.81 KB |
111.39 KB |
|
5 |
Flow diversion banks - General [1]
8 pages Flow Diversion Banks Part 1 – General: An overview of the design of flow diversion banks including geometric parameters, advantages, disadvantages, locations, installation details, and example photos. Fig=3; photos=7; tables=2 |
2.19 KB |
363.52 KB |
|
6 |
Flow diversion bank -on Earth slopes [2]
10 pages Flow Diversion Banks Part 2 – Earth slopes: Design and selection criteria for flow diversion banks placed on open earth slopes. Includes 15 data tables; design process and worked examples. The material contained within this fact sheet has been supplied for use by persons experienced in hydraulic design. Fig=1; photos=2; tables=15 |
N/A |
212.95 KB |
|
7 |
Flow diversion bank -on Grass slopes [3]
8 pages Flow Diversion Banks Part 3 – Grass slopes: Design and selection criteria for flow diversion banks placed on grassed slopes. Includes 11 data tables; design process and worked examples. The material contained within this fact sheet has been supplied for use by persons experienced in hydraulic design. Fig=0; photos=2; tables=11 |
N/A |
146.71 KB |
|
8 |
Flow Diversion banks: All 3 Parts
24 pages |
N/A |
1.26 MB |
|
9 |
Level spreader
5 pages Level Spreaders: Design criteria for level spreaders used to release water flow as sheet flow. Includes several photos, design data tables and sample drawing. Fig=4; photos=2; tables=3 |
2.43 KB |
551.40 KB |
|
10 |
Outlet structure
8 pages Outlet Structures: Design criteria for sizing rock pad outlet structures for use on temporary slope drain and chute outlets. Includes several example drawings and pre-design rock sizing tables and photos. Fig=4; photos=2; tables=6 |
2.79 KB |
483.26 KB |
|
11 |
Slope drain
7 pages Slope Drains: Design criteria for specifying slope drains providing hydraulic capacities for varying pipe sizes, elevations and slopes. Advantages, limitations, common problems, special requirements, site inspection, installation and maintenance. Fig=6; photos=6; tables=3 |
3.18 KB |
473.89 KB |
|
12 |
Emergency Spillway (sediment basins)
9 pages Spillways (sediment basins): This fact sheet addresses issues associated with the design of temporary emergency spillways on construction site sediment basins. The material contained within this fact sheet has been supplied for use by persons experienced in hydraulic design. The fact sheet details design standards and inlet weir flow equations. Design information is not provided […] |
3.46 KB |
887.41 KB |
|
13 |
Temporary bridge crossing
4 pages Temporary Watercourse Crossing – Bridges: An overview of the design consideration applicable to the use of temporary bridge crossings. Advantages, limitations, common problems, special requirements, site inspection, installation and maintenance. Fig=0; photos=3; tables=0 |
3.73 KB |
178.80 KB |
|
14 |
Temporary culvert crossing
8 pages Temporary Watercourse Crossing – Culverts: Temporary culvert crossing require both structural and hydraulic design. The fact sheet provides an overview of the design process including example drawings and photos. Advantages, limitations, common problems, special requirements, site inspection, installation and maintenance. Fig=6; photos=4; tables=1 |
4.96 KB |
920.80 KB |
|
15 |
Temporary downpipe
1 page Temporary Downpipes: An overview of the use of temporary downpipes as used on building and constructions sites. Fig=0; photos=2; tables=0 |
469 B |
102.54 KB |
|
16 |
Temporary ford crossing
5 pages Temporary Watercourse Crossing – Fords: Provides guidance on the use and construction of temporary ford crossings. Design considerations and issue to avoid and include are details along with suitable geo-structural materials. Advantages, limitations, common problems, special requirements, site inspection, installation and maintenance. Fig=2; photos=6; tables=0 |
3.73 KB |
387.08 KB |